Construction sales

CRM for commercial contractors: one project, many bids

What a CRM for commercial contractors has to track that a sales CRM misses: one project bid to several GCs, go or no-go calls, hit rate and the handoff.

Abstract central block linked by thin lines to four smaller blocks, one of them highlighted.

A CRM for commercial contractors has to track pursuits: the projects you are chasing, every party you are bidding them to, the go or no-go call, the bid result and the handoff to operations. A sales CRM built around one customer and one deal does not fit how commercial work is won. A subcontractor may price the same school addition for four general contractors. A general contractor answers to an owner, an architect and sometimes a developer before anyone signs. If the CRM cannot hold that shape, estimators keep working from a spreadsheet and the pipeline report never matches it.

One project, bid to several general contractors

Start with the record structure, because every report depends on it. The project is the thing being built: name, location, owner, architect, bid date, size and scope. Under it sits one bid for each party you priced it for. A mechanical subcontractor bidding a hospital wing to four GCs has one project and four bids.

When firms skip this and log a deal per invitation, the pipeline counts the same wing four times, and so does any forecast built on it. With the project and bid split, the pipeline counts the project once, at the value of your number, and the bid that matters is the one under the GC who gets awarded the job. Negotiated and service work still fits simpler lead stages, which our article on tracking sales leads for a small business covers.

General contractors need the same split in a different direction. The project holds the owner and the design team, and the bids underneath are the ones you invite from trades. Many GCs and subs already send and receive invitations through a bid network. On the subcontractor side, Autodesk describes BuildingConnected Bid Board Pro as taking invitations forwarded from any source and filling in your bid board automatically. If you work that way, the CRM does not need to replace it. It needs to receive the projects you decide to pursue, so relationship history and results live in one place.

A checklist for each pursuit record

Most firms ask for too many fields and then fill none of them. These are the ones that drive decisions:

FieldWhy it matters
Project, location and bid dateThe calendar estimators plan their week around
Owner, architect and GCs biddingWho you are really trying to win over, and who you compete against for the same work
Scope and estimated value of your numberLets the pipeline add up without double counting
Go or no-go decision, date and reasonShows which work you turn down and why
Estimator and hours spentShows what each bid cost to produce
Result, winning GC and your rankTurns lost bids into pricing and relationship data
Award date and handoff ownerMarks the point where operations takes over

The reason fields are the ones people resist and the ones that pay off. Keep them to a short pick list, such as “over capacity”, “outside our region”, “price only, no relationship” or “scope we do not self perform”, so they can be counted later.

Deciding go or no-go before estimating starts

Every bid takes estimator hours, and bidding every invitation spreads those hours across work you were never likely to win. A go or no-go step, recorded in the CRM before takeoff begins, makes that trade visible. Ask the same questions each time: do we know the owner or the GC, is the scope one we perform well, do we have crews for the dates, and is the project inside the area we can staff without long drives.

Capacity is the question that bites hardest where frost shortens the building season. There, invitations for summer work tend to arrive in a rush in late winter and spring. The CRM should show, on one screen, how many bids are due in the next three weeks and who is estimating each one, so a no-go call is made on purpose rather than by a missed deadline.

Reports a commercial contractor should be able to run

With the structure above in place, four reports answer most of what owners and leadership ask:

  1. Hit rate by GC and by project type. The share of bids you won with each general contractor, or each owner for a GC. This is where repeat relationships show up, and where a GC who invites you to every job but never awards you anything becomes obvious.
  2. Bids due and estimator load. Every open pursuit by bid date and estimator, for the coming weeks.
  3. Awarded work not yet started. The value of won projects that have not reached operations, which is the start of a backlog view.
  4. Decline and loss reasons. Counted by quarter, so pricing and pursuit decisions rest on more than memory.

Where the CRM stops and other systems take over

The CRM should own relationships, pursuits and results. Estimating software owns the takeoff and the price. Project management software owns submittals, RFIs and the schedule once the job starts. Accounting owns cost and billing. Trouble starts when the CRM tries to hold cost detail, or when estimators keep a second copy of the bid list because the CRM cannot hold their numbers.

The handoff at award matters more than any single field. Procore, for example, describes its CRM as converting won bids into active projects and carrying documents and notes into the project record. Whatever tool you use, the scope letter, the inclusions and exclusions, and the promises made during the pursuit should reach the project manager without a separate meeting. On one construction engagement, operational reporting and automation took completion rates from 30% to 70%, so plan the reporting that follows award as carefully as the pursuit itself.

Many construction specific CRMs come with a project and bid structure built in, and suit firms whose other systems are construction tools too. A general platform such as Salesforce makes sense when the pursuit data has to connect to an ERP, a service business or other divisions, and when you have someone to configure and maintain it. Either way, the project and bid structure above is what to ask a vendor to demonstrate with your own data.

Start with the spreadsheet you already have

Before you look at any tool, add three columns to the bid spreadsheet your estimators use now: the GC each bid went to, the go or no-go reason from a short pick list, and the result. Fill them in for every bid due this season. In a few months you will have a hit rate by GC and a list of the work you turned down, and that is the data to bring to any vendor demo. Ask each vendor to load it and show the project you priced for several GCs counted once in the pipeline.